Close Menu
    Facebook X (Twitter) Instagram TikTok
    Riddims Ghana Network
    Facebook X (Twitter) Instagram Pinterest
    • Home
    • General News
    • Showbiz
    • Sports News
    • Social Trends
    • Newspaper Headlines
    Riddims Ghana Network
    Home»General News»GPHA Board inspects ongoing projects at Tema Port
    General News

    GPHA Board inspects ongoing projects at Tema Port

    RGNBy RGNOctober 23, 2026No Comments2 Mins Read
    Facebook Twitter WhatsApp
    GPHA Board inspects ongoing projects at Tema Port
    Share
    Facebook Twitter LinkedIn Pinterest Email

    The Board of Directors of the Ghana Ports and Harbours Authority (GPHA), led by its Chairman, John Asiedu Nketiah, has inspected ongoing infrastructure projects at the Port of Tema to assess their progress and potential impact on operations.

    The inspection focused on completed dredging works and the rehabilitation of the port’s breakwaters, which are expected to improve efficiency and enhance the facility’s capacity to handle larger vessels.

    As part of the dredging project, selected berths have been deepened from 11 metres to 14 metres, enabling bigger vessels to berth at the port.

    GPHA’s General Manager of Engineering, Ing. Komla Ofori, briefed the Board on the scope and progress of the projects during the visit.

    Speaking to the media after the inspection, Mr Asiedu Nketiah expressed satisfaction with the completed dredging works and the progress of the breakwater rehabilitation, particularly the advanced technology being used.

    He said the breakwater project was progressing according to schedule and was expected to be completed and handed over within a month.

    The Director-General of GPHA, Major General Paul Seidu Tanye-Kulono, said he was confident the completion of the projects would strengthen the Authority’s operational and commercial prospects.

    He explained that the improved infrastructure would enable larger vessels to berth safely at the Port of Tema, potentially enhancing its capacity to serve the maritime industry.

    The breakwater rehabilitation project is being undertaken by GYTD Group Limited.

    Share. Facebook Twitter WhatsApp
    RGN
    • Website

    Related Posts

    Woman with Ebola in Nigeria confirmed as wife of Swiss diplomat

    October 23, 2026

    Former NDA CEO, two deputies convicted over procurement breaches

    October 23, 2026

    MP for Akyem Oda commissions ultramodern entrance for Oda Methodist College of Education

    October 23, 2026
    Leave A Reply Cancel Reply

    Contact Us
    WhatsApp Us
    Keep Reading

    Woman with Ebola in Nigeria confirmed as wife of Swiss diplomat

    October 23, 2026

    Former NDA CEO, two deputies convicted over procurement breaches

    October 23, 2026

    ‘Replace hypocrisy in the dictionary with my face’ – Sarkodie replies trolls

    October 23, 2026

    ‘I was a serious porn addict in JHS’ – Yaw Siki

    October 23, 2026

    Shatta Wale codes his own apps without a development team – Sarkodie

    October 23, 2026

    GPHA Board inspects ongoing projects at Tema Port

    October 23, 2026

    MP for Akyem Oda commissions ultramodern entrance for Oda Methodist College of Education

    October 23, 2026
    1 2 3 … 58 Next
    © 2026 Riddims Ghana Network. Designed by RGN.

    Type above and press Enter to search. Press Esc to cancel.